The news
The bath that took too long
Draft: written by an AI helper and not yet checked by a teacher.
Tap a paragraph to see it in words.
News from the bathroom: a bath that should have filled in fifteen minutes took almost nineteen. The bath holds a hundred and fifty litres and the tap gives ten litres every minute, so fifteen minutes was the plan.
Bath news: it should fill in min, but took almost . The bath holds L and the tap gives L/min, so the plan was min.
Volume , tap , leak (litres, minutes): . Plan: .
The culprit was the plug. It leaked two litres every minute, so the bath gained only eight litres a minute. After fifteen minutes there were just a hundred and twenty litres in it.
The culprit: the plug leaks L/min, so the net gain is L/min. After min there are L.
Real: , and .
The last thirty litres took a further three minutes and forty-five seconds: eighteen minutes and forty-five seconds in all. Meanwhile thirty-seven and a half litres ran away down the drain.
The last L took min, so min in all. Lost down the drain: L.
; lost: .
Plumbers advise pressing the plug in firmly. With no leak, the bath fills in fifteen minutes and not a drop is lost.
Advice: press the plug in firmly. No leak time min and loss L.
.
Letters of words: 562 → 234 → 41.
How to read the signs
- V over r; the volume divided by the rate
- the leak (a letter l)
- times
- divided by
- then; it follows that